What’s New?


The following webpages have been added, completed, and/or significantly updated:


Date Description
01/15/2006 Updated the process engineering tasks.
01/14/2006 Updated the process engineering work products.
12/27/2005 Added requirements checklist.
10/24/2005 Added diagrams to all of the requirements engineering tasks.
Added classification diagrams to various other method components.
Created xml files for organizations.
Work started on Java code to maintain xml files.
10/2005 The Requirements Elicitation task is renamed to Requirements Identification so that requirements elicitation can become one of the requirements engineering techniques (along with requirements invention).
All of the inspection teams have been renamed as evaluation teams so that there is no implication that the teams must use inspection as their only (or even primary) evaluation technique. Work is continuing on fixing all of the associated broken links.
The websites achieve their one millionth visit.
Migration of the website from www.donald-firesmith.com to www.opfro.org as part of making the repository free, open-source, and controlled by the OPR Repository Organization (OPFRO). The previous URL remains a mirror website because of the excellent search engine ratings of many of the webpages.
Work is rapidly progressing on standardizing the schemas of the method components in preparation for translation from of the method component files from XHTML to XML. Emphasis is being placed on standard naming of method components (singular for process component classes), standardizing the definitions, adding a classification section including a diagram showing the location of the method component in the OPF method component inheritance hierarchy, and replacing goals and benefits with class responsibilities.
09/25/2005 Heavily updated all of the configuration management activities and tasks.
09/24/2005 Heavily updated the risk management activity as well as all related risk management tasks and risk management work products.
09/10/2005 Updated robustness.
08/18/2005 Replaced Firesmith logo with OPFRO logo showing reusable method components rising out of a repository (cylinder labeled OPF) resting on a strong metamodel foundation.
08/16/2005 Added XML translation guidelines to support the translation of the method components from XHTML to XML.
08/12/2005 Updated the content worker roles.
08/06/2005 Updated majority of the roles, especially system architect.
07/31/2005 Updated all of the endeavor management tasks.
07/30/2005 Updated the integration activity and the following quality factors: continuity, robustness, and stability.
07/24/2005 Updated all 70+ teams to meet content and format standard, add class diagrams, and ensure that they are XHTML 1.0 Strict compliant.
07/13/2005 Updated all organizations to meet content and format standard, add class diagrams, and ensure that they are XHTML 1.0 Strict compliant.
07/09/2005 Updated all endeavors, languages, and tools to meet content and format standard, add class diagrams, and ensure that they are XHTML 1.0 Strict compliant.
06/27/2005 Transitioned from www.donald-firesmith.com to the new URL: www.opfro.org.
06/26/2005 Added modifiability and significantly updated all other development-oriented quality factors.
06/12/2005 Added graphics to all types of organization.
06/11/2005 Added software development plan and system development plan. Developed initial xml, xsl, and xsd files as a foundation for translating repository from xhtml to xml preparation for development of tool support.
05/29/2005 Updated all stages including cycles, phases, builds, and milestones.
05/28/2005 Updated the metamodel webpage by adding method component sets. Updated the requirements engineering webpage. Updated all of the tools webpages. Renamed and expanded the user interface team webpage. Updated numerous webpages from XHTML-transitional to XHTML-strict.
05/21/2005 Significantly updated all of the website overview webpages, but especially the metamodel and method_construction_guidelines webpages to support the current metamodel. Significantly updated the process engineering activity webpage as well as the associated process engineering tasks: method_construction method_consulting, method_documentation, method_evaluation, method_maintenance, method_mandating, method_monitoring, method_reuse, process_framework_construction, process_framework_documentation, process_framework_maintenance, process_framework_mandating, process_framework_reuse, process_framework_needs_assessment, process_needs_assessment, and process_repository_management.
05/14/2005 Added the architecture_analysis task webpage. Significantly updated the architecting activity webpage as well as the architectural_mechanism_production, architectural_patterns_selection, architecture_production, and architecture_reuse task webpages.
05/08/2005 Greatly updated the activities and tasks webpages.
05/07/2005 Greatly updated all of the language webpages with classification information and class diagrams to match the new standard format that provides consistency across process component classes for XML translation. Added system. Updated both robustness and robustness requirements.
04/30/2005 Greatly updated all of the conventions webpages. Created the process framework webpage.
04/24/2005 Greatly updated the metamodel webpage to replace a traditional approach based on metaclasses and instantiation with a more consistent and complete one based on classes, inheritance, and instantiation.
04/17/2005 Deleted Work Performances as a metamodeling level 2 metaclass process component because it is actually a metamodeling level 0 instance of a work unit. Moved work flows under work units. Updated the different kinds of conventions and moved them into the process set of work products.
04/12/2005 Major changes to the repository (OPF components) part of the primary navigation frame on left side of each webpage to better match the metamodel. Organizing work products by type as well as by associated activity that produces them.
04/08/2005 Updated the metamodel. Conventions have been placed under work products. Techniques and workflows have been placed under work units. Numerous diagrams being added to metamodel and core metatypes.
04/03/2005 Updated the context diagram.
03/23/2005 Updated the architecture reuse task.
03/16/2005 Updated the technology analysis task.
03/13/2005 Added adaptive_maintainability, corrective_maintainability, perfective_maintainability, preventative_maintainability, and predictability.
Updated the remaining quality_factors.
02/19/2005 Added stability.
02/13/2005 Updated the process consultant.
02/12/2005 Significantly updated security.
02/10/2005 Added future enhancements.
02/06/2005 Added computer_security_incident_response team, OPFRO_conventions, and repository_extension_procedure.
01/29/2005 Updated phases in preparation for supporting the manufacturing of many copies of a system.
01/24/2005 Website successfully translated from HTML to XHTML with vast majority XHTML Strict.
Project to translate website to XML, XSL, and DTD initiated.
Initial tool development team formed.
01/23/2005 Added kudo awards for outstanding volunteer effort.
Began upload of XHTML replacement of HTML files.
01/22/2005 Added process engineer’s forum.
01/22/2005 Updated quality engineering.
01/15/2005 Updated future_enhancements.
01/09/2005 Added team_charter, team_charter_work_flow, XHTML_Template, and MS_Word_Template.
11/25/2004 Added performance_modeling and physical_requirements.
11/06/2004 Updated work_breakdown_structure.
10/30/2004 Updated process_consultant.
10/19/2004 Updated safety_auditor and added safety_certifier and safety_evaluator.
10/17/2004 Updated safety_case.
10/10/2004 Updated system_architecture_document and updated glossary_A
10/03/2004 Added configuration_diagram.
09/29/2004 Updated system_architecture_document.
08/21/2004 Updated safety_policy.
07/25/2004 Updated identification_requirements and authentication_requirements.
06/18/2004 Updated technology_readiness_assessment and added associated content_and_format_standard.
06/13/2004 Added decision_making.
06/12/2004 Added partial draft of EIA-731.1) Systems_Engineering_Capability_Model_compliance.
06/06/2004 Added technology_readiness_assessment.
05/23/2004 Added standards_compliance and partial draft of SEI_CMMI_compliance.
04/25/2004 Updated requirements_evaluation and external_interface_specification. Added reliability_testing.
04/24/2004 Updated business_rules and added business_rules_catalog.
03/25/2004 Updated components.
02/28/2004 Added the following work product webpages: anonymity and confidentiality. Updated privacy, identification, authentication, external_API_requirements, and operations_manual.
03/25/2004 Updated use_case_diagrams.
03/23/2004 Updated safety and safety_requirements.
03/07/2004 Added the safety_case.
02/15/2004 Added the following safety work product webpages: accident_frequency_categorization, accident_severity_categorization, hazard_cause_tree, hazard_effects_tree, and safety_risk_categorization. Updated safety_risk_analysis and safety_program_planning.
01/18/2004 Updated interoperability, robustness, security, utility and added evaluation_plan and operational_environment_compatibility.
01/17/2004 Updated capacity and added defensibility and dependability.
12/13/2003 Updated the following performance webpages: quality_model, quality_factors, performance, quality_subfactors, jitter, latency, response_time, schedulability, throughput, jitter_requirements, latency_requirements, response_time_requirements, schedulability_requirements, and throughput_requirements.
12/06/2003 Updated the following security webpages: security, access_control, authentication, authorization, availability_protection, identification, intrusion_detection, physical_protection, and privacy.
11/09/2003 Updated the following safety webpages: accident_investigation, accident_investigation_report, safety_engineer, safety_engineering, safety_certificate, safety_certification, safety_compliance_assessment, safety_compliance_report, safety_compliance_repository, safety_monitoring, safety_program_planning, safety_program_plan, safety_requirements, safety_risk_analysis, safety_risk_analysis_report, safety_status_report, and safety_engineer.
08/17/2003 Updated the security_policy webpage.
07/27/2003 Updated the external_API_specification webpage.
07/11/2003 Website made FREE.
06/21/2003 Updated the system_requirements_specification webpage.
06/21/2003 Heavily updated and added to the numerous quality_requirements webpages.
04/26/2003 Updated the requirements_engineering webpages.
04/26/2003 Updated and renamed the requirements elicitation task to requirements_identification.
04/26/2003 Added the personnel_component and the procedural_component webpages.
04/18/2003 Updated the quality_model and the system_architecture_document webpages.
04/13/2003 Added the scheduling_requirements webpage.
04/13/2003 Updated the constraints and the data_requirements webpage.
02/03/2003 Updated the architecture_set and the system_architecture_document webpages.
02/01/2003 Heavily updated the risk_management activity, the associated risk_management_planning, risk_identification, risk_analysis, risk_control, and risk_monitoring tasks, and the associated risk_management_plan, risk_analysis, and risk_monitoring_report work products.
01/07/2003 Heavily updated the testing activity and added the following testing subactivity webpages: hardware integration_testing, internationalization_testing, operational_testing, and usage_testing.
01/05/2003 Heavily updated the security_engineering activity and security_policy_production task webpages.
01/03/2003 Added the process_consultant webpage.
12/23/2002 Added the product_standards_committee webpage.