The following webpages have been added, completed, and/or significantly updated:
Date | Description |
---|---|
01/15/2006 | Updated the process engineering tasks. |
01/14/2006 | Updated the process engineering work products. |
12/27/2005 | Added requirements checklist. |
10/24/2005 | Added diagrams to all of the
requirements engineering
tasks. Added classification diagrams to various other method components. Created xml files for organizations. Work started on Java code to maintain xml files. |
10/2005 | The Requirements Elicitation task is renamed to
Requirements Identification so that requirements elicitation can become one of the requirements
engineering techniques (along with requirements invention).
All of the inspection teams have been renamed as evaluation teams so that there is no implication that the teams must use inspection as their only (or even primary) evaluation technique. Work is continuing on fixing all of the associated broken links. The websites achieve their one millionth visit. Migration of the website from www.donald-firesmith.com to www.opfro.org as part of making the repository free, open-source, and controlled by the OPR Repository Organization (OPFRO). The previous URL remains a mirror website because of the excellent search engine ratings of many of the webpages. Work is rapidly progressing on standardizing the schemas of the method components in preparation for translation from of the method component files from XHTML to XML. Emphasis is being placed on standard naming of method components (singular for process component classes), standardizing the definitions, adding a classification section including a diagram showing the location of the method component in the OPF method component inheritance hierarchy, and replacing goals and benefits with class responsibilities. |
09/25/2005 | Heavily updated all of the configuration management activities and tasks. |
09/24/2005 | Heavily updated the risk management activity as well as all related risk management tasks and risk management work products. |
09/10/2005 | Updated robustness. |
08/18/2005 | Replaced Firesmith logo with OPFRO logo showing reusable method components rising out of a repository (cylinder labeled OPF) resting on a strong metamodel foundation. |
08/16/2005 | Added XML translation guidelines to support the translation of the method components from XHTML to XML. |
08/12/2005 | Updated the content worker roles. |
08/06/2005 | Updated majority of the roles, especially system architect. |
07/31/2005 | Updated all of the endeavor management tasks. |
07/30/2005 | Updated the integration activity and the following quality factors: continuity, robustness, and stability. |
07/24/2005 | Updated all 70+ teams to meet content and format standard, add class diagrams, and ensure that they are XHTML 1.0 Strict compliant. |
07/13/2005 | Updated all organizations to meet content and format standard, add class diagrams, and ensure that they are XHTML 1.0 Strict compliant. |
07/09/2005 | Updated all endeavors, languages, and tools to meet content and format standard, add class diagrams, and ensure that they are XHTML 1.0 Strict compliant. |
06/27/2005 | Transitioned from www.donald-firesmith.com to the new URL: www.opfro.org. |
06/26/2005 | Added modifiability and significantly updated all other development-oriented quality factors. |
06/12/2005 | Added graphics to all types of organization. |
06/11/2005 | Added software development plan and system development plan. Developed initial xml, xsl, and xsd files as a foundation for translating repository from xhtml to xml preparation for development of tool support. |
05/29/2005 | Updated all stages including cycles, phases, builds, and milestones. |
05/28/2005 | Updated the metamodel webpage by adding method component sets. Updated the requirements engineering webpage. Updated all of the tools webpages. Renamed and expanded the user interface team webpage. Updated numerous webpages from XHTML-transitional to XHTML-strict. |
05/21/2005 | Significantly updated all of the website overview webpages, but especially the metamodel and method_construction_guidelines webpages to support the current metamodel. Significantly updated the process engineering activity webpage as well as the associated process engineering tasks: method_construction method_consulting, method_documentation, method_evaluation, method_maintenance, method_mandating, method_monitoring, method_reuse, process_framework_construction, process_framework_documentation, process_framework_maintenance, process_framework_mandating, process_framework_reuse, process_framework_needs_assessment, process_needs_assessment, and process_repository_management. |
05/14/2005 | Added the architecture_analysis task webpage. Significantly updated the architecting activity webpage as well as the architectural_mechanism_production, architectural_patterns_selection, architecture_production, and architecture_reuse task webpages. |
05/08/2005 | Greatly updated the activities and tasks webpages. |
05/07/2005 | Greatly updated all of the language webpages with classification information and class diagrams to match the new standard format that provides consistency across process component classes for XML translation. Added system. Updated both robustness and robustness requirements. |
04/30/2005 | Greatly updated all of the conventions webpages. Created the process framework webpage. |
04/24/2005 | Greatly updated the metamodel webpage to replace a traditional approach based on metaclasses and instantiation with a more consistent and complete one based on classes, inheritance, and instantiation. |
04/17/2005 | Deleted Work Performances as a metamodeling level 2 metaclass process component because it is actually a metamodeling level 0 instance of a work unit. Moved work flows under work units. Updated the different kinds of conventions and moved them into the process set of work products. |
04/12/2005 | Major changes to the repository (OPF components) part of the primary navigation frame on left side of each webpage to better match the metamodel. Organizing work products by type as well as by associated activity that produces them. |
04/08/2005 | Updated the metamodel. Conventions have been placed under work products. Techniques and workflows have been placed under work units. Numerous diagrams being added to metamodel and core metatypes. |
04/03/2005 | Updated the context diagram. |
03/23/2005 | Updated the architecture reuse task. |
03/16/2005 | Updated the technology analysis task. |
03/13/2005 | Added
adaptive_maintainability,
corrective_maintainability,
perfective_maintainability,
preventative_maintainability, and
predictability. Updated the remaining quality_factors. |
02/19/2005 | Added stability. |
02/13/2005 | Updated the process consultant. |
02/12/2005 | Significantly updated security. |
02/10/2005 | Added future enhancements. |
02/06/2005 | Added computer_security_incident_response team, OPFRO_conventions, and repository_extension_procedure. |
01/29/2005 | Updated phases in preparation for supporting the manufacturing of many copies of a system. |
01/24/2005 | Website successfully translated
from HTML to XHTML with vast majority XHTML Strict. Project to translate website to XML, XSL, and DTD initiated. Initial tool development team formed. |
01/23/2005 | Added kudo awards for outstanding volunteer effort. Began upload of XHTML replacement of HTML files. |
01/22/2005 | Added process engineer’s forum. |
01/22/2005 | Updated quality engineering. |
01/15/2005 | Updated future_enhancements. |
01/09/2005 | Added team_charter, team_charter_work_flow, XHTML_Template, and MS_Word_Template. |
11/25/2004 | Added performance_modeling and physical_requirements. |
11/06/2004 | Updated work_breakdown_structure. |
10/30/2004 | Updated process_consultant. |
10/19/2004 | Updated safety_auditor and added safety_certifier and safety_evaluator. |
10/17/2004 | Updated safety_case. |
10/10/2004 | Updated system_architecture_document and updated glossary_A |
10/03/2004 | Added configuration_diagram. |
09/29/2004 | Updated system_architecture_document. |
08/21/2004 | Updated safety_policy. |
07/25/2004 | Updated identification_requirements and authentication_requirements. |
06/18/2004 | Updated technology_readiness_assessment and added associated content_and_format_standard. |
06/13/2004 | Added decision_making. |
06/12/2004 | Added partial draft of EIA-731.1) Systems_Engineering_Capability_Model_compliance. |
06/06/2004 | Added technology_readiness_assessment. |
05/23/2004 | Added standards_compliance and partial draft of SEI_CMMI_compliance. |
04/25/2004 | Updated requirements_evaluation and external_interface_specification. Added reliability_testing. |
04/24/2004 | Updated business_rules and added business_rules_catalog. |
03/25/2004 | Updated components. |
02/28/2004 | Added the following work product webpages: anonymity and confidentiality. Updated privacy, identification, authentication, external_API_requirements, and operations_manual. |
03/25/2004 | Updated use_case_diagrams. |
03/23/2004 | Updated safety and safety_requirements. |
03/07/2004 | Added the safety_case. |
02/15/2004 | Added the following safety work product webpages: accident_frequency_categorization, accident_severity_categorization, hazard_cause_tree, hazard_effects_tree, and safety_risk_categorization. Updated safety_risk_analysis and safety_program_planning. |
01/18/2004 | Updated interoperability, robustness, security, utility and added evaluation_plan and operational_environment_compatibility. |
01/17/2004 | Updated capacity and added defensibility and dependability. |
12/13/2003 | Updated the following performance webpages: quality_model, quality_factors, performance, quality_subfactors, jitter, latency, response_time, schedulability, throughput, jitter_requirements, latency_requirements, response_time_requirements, schedulability_requirements, and throughput_requirements. |
12/06/2003 | Updated the following security webpages: security, access_control, authentication, authorization, availability_protection, identification, intrusion_detection, physical_protection, and privacy. |
11/09/2003 | Updated the following safety webpages: accident_investigation, accident_investigation_report, safety_engineer, safety_engineering, safety_certificate, safety_certification, safety_compliance_assessment, safety_compliance_report, safety_compliance_repository, safety_monitoring, safety_program_planning, safety_program_plan, safety_requirements, safety_risk_analysis, safety_risk_analysis_report, safety_status_report, and safety_engineer. |
08/17/2003 | Updated the security_policy webpage. |
07/27/2003 | Updated the external_API_specification webpage. |
07/11/2003 | Website made FREE. |
06/21/2003 | Updated the system_requirements_specification webpage. |
06/21/2003 | Heavily updated and added to the numerous quality_requirements webpages. |
04/26/2003 | Updated the requirements_engineering webpages. |
04/26/2003 | Updated and renamed the requirements elicitation task to requirements_identification. |
04/26/2003 | Added the personnel_component and the procedural_component webpages. |
04/18/2003 | Updated the quality_model and the system_architecture_document webpages. |
04/13/2003 | Added the scheduling_requirements webpage. |
04/13/2003 | Updated the constraints and the data_requirements webpage. |
02/03/2003 | Updated the architecture_set and the system_architecture_document webpages. |
02/01/2003 | Heavily updated the risk_management activity, the associated risk_management_planning, risk_identification, risk_analysis, risk_control, and risk_monitoring tasks, and the associated risk_management_plan, risk_analysis, and risk_monitoring_report work products. |
01/07/2003 | Heavily updated the testing activity and added the following testing subactivity webpages: hardware integration_testing, internationalization_testing, operational_testing, and usage_testing. |
01/05/2003 | Heavily updated the security_engineering activity and security_policy_production task webpages. |
01/03/2003 | Added the process_consultant webpage. |
12/23/2002 | Added the product_standards_committee webpage. |